Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for mobile phone industry professionals · Thursday, July 11, 2024 · 726,970,986 Articles · 3+ Million Readers

Resurfacing Work to Close Lanes on I-840 in Rutherford County

Thursday, July 11, 2024 | 03:31pm

Nashville, Tenn. - The Tennessee Department of Transportation (TDOT) will be conducting weekend lane and ramp closures on Interstate 840 in Rutherford County.

Crews with Jones Bros. Contractors will conduct lane and ramp closures beginning Friday, July 12 at 8 p.m. until Monday, July 15 at 5 a.m. One lane will remain open.

I-840 will be reduced to one lane of travel at MM 54. Two ramp closures will also be in effect: the entrance ramp from US 41 to I-840 and the 55B exit ramp from I-840 to US 41. Detour signs will be posted.

The work is part of a resurfacing project stretching from US 70 to near the West Fork Stones River.

All work is weather-dependent. Drivers are urged to slow down and allow for extra time to travel through the area.

As always, drivers are reminded to slow down and move over when traveling through a work zone. The Move Over Law was passed in 2006. The penalty for violating the law in Tennessee carries the possibility of up to 30 days in jail and a maximum fine of up to $500.

Get the latest construction activity traffic updates from the TDOT SmartWay map (https://smartway.tn.gov). Travelers can also call 511 for travel information.

Powered by EIN Presswire
Distribution channels:


EIN Presswire does not exercise editorial control over third-party content provided, uploaded, published, or distributed by users of EIN Presswire. We are a distributor, not a publisher, of 3rd party content. Such content may contain the views, opinions, statements, offers, and other material of the respective users, suppliers, participants, or authors.

Submit your press release